PHOTOS - Road widening project outside Disney's Hollywood Studios entrance

Mar 09, 2012 in "Disney's Hollywood Studios"

The road widening project outside of the secondary entry/exit at Disney's Hollywood Studios is well underway.  As you can see from the photos below, the lane is marked out, and roughed in on some parts of the route.  Interestingly, an area has also been cleared in the trees with an access road running directly form the Studios exit road to Victory Way, bypassing Buena Vista Blvd.  It seems that Disney has some big plans for the Studios traffic flow, with speculation suggesting the secondary entry/exit on Buena Vista Blvd will eventually be used by Disney Transportation, and as an exit only for cars.  This would leave the original main entrance as the primary entry to the Studios.
Article Posted: Mar 09, 2012 / 10:46am EST
The Edison construction

The Edison construction

2 hours ago3 photos
World of Coca-Cola construction

World of Coca-Cola construction

22 hours ago4 photos
Paradiso 37 overview

Paradiso 37 overview

22 hours ago4 photos