PHOTOS - Crane lift now installed for Contemporary rooftop refurbishment

Feb 15, 2013 in "Disney's Contemporary Resort"

In preparation for the major refurbishment on the top floors of Disney's Contemporary Resort, a two part crane lift has been setup on the north side of the tower. The lift runs from ground level to the rooftop, and will presumably be used to deliver and remove construction materials. Check out the photos below for a look.
Article Posted: Feb 15, 2013 / 11:07am EST