H
Should take out the engines and put in some paddles for the guests to save money on fuel.
M
↩ replying to Tom P.Good grief how’s about dough made by hand with fresh ingredients, not in an industrial kitchen and shipped in an 18 wheeler to a distribution warehouse where its sits until it’s transferred to its end destination restaurant where it will sit refrigerated until its needed.
Yummmm
T
↩ replying to monothingieI think they are fine just as they are.
S
I just can never get over how far in advance they expect the consumer to plan, but how little notice they can give their consumer to something of this magnitude.
I get it’s in the fine print. But do better.
T
↩ replying to monothingieImagineers spent lots of money on a research trip to find out that beignets are made near a salt dome and then shipped in crates to be handled by a co op. Provided that pesky snake doesn’t snatch them.
*only assuming the research trip was only spent on bourbon street…..*
M
↩ replying to surfsupdonSometimes work is unexpected. I’m not saying this is one of those times (have no way of knowing) but sometimes the short notice is because it was a project they weren’t planning on doing (at least not right then).
S
Some of the work being done at the moment on the wall, continuing on from the section done previously between springs and Saratoga dock
E
↩ replying to Mr. SullivanSometimes it is, but I doubt this is. They did the same with the boat docks at the MK resorts, gave a week or two notice, pretty poor even by their standards.
F
↩ replying to DCBakerInstallation of defensive positions to take care of those without a dining or resort reservation.
C
↩ replying to HakunaMatata89And advertise it as a weekend boot camp for guests who don't want to do a Disney Run
H
↩ replying to CalmdownnowImmersive experience for free!
C
↩ replying to HakunaMatata89Free for resort guests. Maybe there would be a use for those non-resort guests after all!
D
According to Disney, the Sassagoula River Cruise at Old Key West will be temporarily unavailable from October 12 through November 1, 2026, due to ongoing refurbishment work along the boat route. Bus transportation will be available during the closure.