M
Well it's less cringe than Zach's Instagram.
Do you think she had to buy the new and clean boots and PPE, or did costuming get it for her?
J
↩ replying to DCBakerLooks like everything is still gutted. Wonder if they’ll install all of the show scenes and test the ride by summer 2025
T
↩ replying to JayspencyThe thing is, we don’t really know when this promo was filmed. It may look totally different now.
J
↩ replying to monothingieMy employer better be buying the PPE and I get a shoe allowance or I'm calling OSHA
D
↩ replying to DCBakerNot a fan of that show scene that looks like office cubicles. ;)
D
↩ replying to The Leader of the ClubThey also showed very little of the ride path, so even if this is current it could be in a scene that just hasn't had much work done to it yet. There could be fully finished scenes by now for all we know (though I doubt it)
J
↩ replying to danlb_2000Something something Epcot community college joke
J
From what I could gather from the video it seemed to have shown the responsiveness test (1st scene shown), the capability/rough road test, (3rd scene shown), and what I assume is the turn immediately after the hill climb test or a part of the queue (second scene shown). I also noticed in the former responsiveness test footage the Imagineer was walking on some kind of wood structure. I assume that if this scene aligns with the concept art, its part of some framing for some terrain edges. In addition to this I noticed that the neon yellow outline on the barriers of the track for the former capability test were still painted on.
TL DR: From whenever the footage was taken, Imagineering has seemed to have started some early work on the former responsiveness test, while potentially still deconstructing the remaining pieces of the former capability test. As for the second clip shown I have little to no idea what/where that is.
T
It sounds to me like this new version of the ride is going to be just a modern "World of Motion", and it also sounds like the entire outdoor portion is now going to be a show scene. No more closing during bad weather!
C
↩ replying to Charlie The Chatbox GhostIt says it will be outdoors still
H
↩ replying to Charlie The Chatbox GhostI would not count on the outdoor part being enclosed.
I don't think Tessa had ever set foot on-site until that video was shot. If she had, she certainly wasn't doing any manual labor - as noted, her boots were pristine, as were her gloves. And from her voice and inflections, she sounds like she's like 20 and not like a 10+ year WDI vet. I half-expec'ed her to say something was impor'ant. (sorry, just a rip on how terribly stupid many people talk these days)
G
↩ replying to HauntedPirateWell, she did say she is a set designer, so she likely isn't doing the actual construction but brought in to make a video to remind people this is still happening. If she worked on Aulani which opened in 2011, she must have progressed through WDI over the last 10+ years.
H
↩ replying to GuseyWell, I, for one, am glad to have the video reminder that this project was still happening. The construction outside didn't give any clues. ;) But in all seriousness, I don't know what the point of that video was. Show us a couple of decent bits from the inside, not just a random WDI person being highlighted walking down the up-ramp after load.
J
↩ replying to HauntedPirateWDI has been posting videos about the background of their imagineers more recently. That was probably more of the focus than actually showing the ride (since it looks like there’s not much to show in the building anyway)